demob-2ze.2.2: Foreman made no progress: sprites: draw rectangles at origin 0 scale 1 in push order #12

Closed
opened 2026-11-19 16:05:38 +00:00 by computercrack-sandfortress-ci · 1 comment

Escalation stuck (Foreman made no progress) for beads ticket demob-2ze.2.2, revision 1.

Code phase hit the budget (4 timeouts, held commits refs/held/demob-2ze.2.2/1..3, loop advice split) and split refuses at depth 2 (2ze -> 2ze.2 -> 2ze.2.2). Pieces: (1) draw one rectangle: sprite.wgsl palette fix, 48-byte ShaderInstance, pipeline/descriptor setup with Drop, Target draw methods, single-rect test (new fns, external=1, ~30 min); (2) several rectangles in push order and Err(Resource) past 1024 instances (after 1, ~15 min). Please re-create as two tickets, or run sf loop retry if a held commit is near done.

Reply with a comment whose first word is approve (lifts the hold for this revision), reject (drops the item; the rest of the comment is the reason) or anything else (a revision request for the Foreman).

sf-escalation: demo-b/demob-2ze.2.2/stuck

Escalation `stuck` (Foreman made no progress) for beads ticket `demob-2ze.2.2`, revision 1. Code phase hit the budget (4 timeouts, held commits refs/held/demob-2ze.2.2/1..3, loop advice split) and split refuses at depth 2 (2ze -> 2ze.2 -> 2ze.2.2). Pieces: (1) draw one rectangle: sprite.wgsl palette fix, 48-byte ShaderInstance, pipeline/descriptor setup with Drop, Target draw methods, single-rect test (new fns, external=1, ~30 min); (2) several rectangles in push order and Err(Resource) past 1024 instances (after 1, ~15 min). Please re-create as two tickets, or run sf loop retry if a held commit is near done. Reply with a comment whose first word is `approve` (lifts the hold for this revision), `reject` (drops the item; the rest of the comment is the reason) or anything else (a revision request for the Foreman). sf-escalation: demo-b/demob-2ze.2.2/stuck
Author
Collaborator

demob-2ze.2.2 is superseded by demob-2ze.2.3 (filed 2026-11-23 after a probe in the VM on abb4fe1). Cause: the locked tests used another uv meaning than demob-2ze.1 defines, and three defects of the base shader/layout made every draw wrong. The new ticket states the convention with literals and names the three defects. One ticket instead of two: several rectangles in push order come with the same draw call and would leave the second ticket without a failing test. Closed by the maintainer host on standing instruction.

demob-2ze.2.2 is superseded by demob-2ze.2.3 (filed 2026-11-23 after a probe in the VM on abb4fe1). Cause: the locked tests used another uv meaning than demob-2ze.1 defines, and three defects of the base shader/layout made every draw wrong. The new ticket states the convention with literals and names the three defects. One ticket instead of two: several rectangles in push order come with the same draw call and would leave the second ticket without a failing test. Closed by the maintainer host on standing instruction.
Sign in to join this conversation.
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
ComputerCrack/rust-vulkan-fog-platformer#12
No description provided.